Assembly fencing

Assembly of system panels with underpinning concrete work.

ATTENTION!

The underpinning concrete work should be assembled after previous setting of fencing and embedding posts in concrete. All elements of the underpinning concrete work should be in turn assembled (fastener – concrete board – fastener) beginning from the corner or end fastener.

Assembly of the corner post on underpinning concrete work – the post should be set at the angle of 45º.

Assembly of the concrete board and intermediate fastener before embedding in concrete.

Assembly of the concrete board and intermediate fastener after embedding in concrete.

Erection drawing of panel with post with the use of assembly strip (patented system).

ATTENTION!

For the sake of the necessity of an appropriate tension of the panels, concreting of the posts has to follow the fastening of the panel (the panel cannot be fastened to previous embedded posts in concrete).

Erection drawing with the use of butterfly screws as clamping screws.

This system enables the assembly of D-1 and D-2 type panel fencings to posts with any profile, e.g. square, rectangular or round. It also enables the assembly of panels to previous put posts (patented system).